ADOT expects 21 EV charging stations operational by end of 2025
Construction of these stations will be paid for with a mixture of federal funds (80%) and a yet-to-be-determined private company (20%) that will, in the end, own and operate these locations.
Construction of these stations will be paid for with a mixture of federal funds (80%) and a yet-to-be-determined private company (20%) that will, in the end, own and operate these locations.
